YOOYUN Langfuse Single-Node Compose Sizing Guide

Maps Langfuse official 4C/16G/100G Docker Compose baseline to YOOYUN hk_pro/jp_pro/us_pro plans; only Standard (8C/16G) meets CPU+RAM

Table of contents
  1. 1.Introduction & Key Takeaways
  2. 2.Cross-Plan Parameter Comparison
  3. 3.Detailed Breakdown
  4. 3.1.YOOYUN Deploy Langfuse: Mapping Official Compose Minimums
  5. 4.Scenario-Based Selection & Pitfall Checklist
  6. 5.FAQ
  7. 6.Sources & References
YOOYUN Langfuse Single-Node Compose Sizing Guide

Introduction & Key Takeaways

Langfuse’s official documentation sets the minimum virtual machine specification for a single-node Docker Compose deployment — comprising seven services (web, worker, AI Gateway, ClickHouse, MinIO, Redis, Postgres) — at 4 vCPU, 16 GiB RAM, and 100 GiB disk. Total compressed image size is approximately 980 MB. This article maps that baseline exclusively against YOOYUN (formerly Renwang) hk_pro, jp_pro, and us_pro cloud server plans; it does not cover production-grade service separation. All three zones share identical hourly pricing, converted to monthly using 720 hours. Core finding: only the Standard tier (8 vCPU / 16 GiB) satisfies both CPU and RAM thresholds simultaneously. However, every tier ships with a fixed 20 GB system disk that cannot be expanded; a separate data disk must be purchased to reach the required 100 GiB. The us_pro_special zone explicitly lacks data backup capability and must not store the sole copy of critical data.

Cross-Plan Parameter Comparison

Plan vCPU / RAM Monthly (¥) HK Peak BW JP Peak BW US Peak BW Meets 4C/16G/100G Key Limits / Undisclosed
Nano 1C / 2 GB 39.6 20M 20M 50M No (CPU & RAM short) 20 GB system disk, non-expandable
Mini 2C / 4 GB 79.2 30M 30M 50M No (CPU & RAM short) 20 GB system disk, non-expandable
Air 4C / 8 GB 158.4 40M 40M 100M No (CPU met, RAM only 8 GB) 20 GB system disk, non-expandable
Standard 8C / 16 GB 316.8 50M 50M 100M Yes (CPU headroom, RAM meets 16 GB) 20 GB system disk, must add data disk for 100 GiB
Pro / Ultra Not disclosed Not disclosed Not disclosed Not disclosed Not disclosed Beyond single-node Compose scope Only relevant if co-locating object storage/repos long-term

Traffic pricing (per GB): hk_pro ¥0.05, hk_bgp ¥0.015, jp_pro ¥0.05, us_pro ¥0.025. Snapshot storage costs 10% of plan price, stored on same node — suitable for short-term rollback only; long-term backup requires cross-node copy. New purchases enjoy 3-day no-questions refund; used hours billed at actual rate, remainder returned via original payment method. Singapore, Korea, and Taiwan zones currently have no purchasable plans via API.

Detailed Breakdown

YOOYUN Deploy Langfuse: Mapping Official Compose Minimums

Data sourced from api.yooyun.com plan and zone listings as of 2026-11-27, cross-referenced with Langfuse’s official Docker Compose deployment page Sizes table. The single-node Compose stack includes seven services with individual compressed image sizes: web 235 MB, worker 173 MB, AI Gateway 28 MB, ClickHouse 267 MB, MinIO 64 MB, Redis 44 MB, Postgres 167 MB — totaling ~980 MB. Official baseline VM: 4 vCPU, 16 GiB RAM, 100 GiB disk (example AWS t3.xlarge). Host ports: 3000 (web), 9090 (MinIO), 3031 (AI Gateway). The documentation explicitly states this table applies only to “single-node trial”; production requires per-service scaling per the scaling guide.

Mapping follows “CPU and RAM must both meet; check Standard first”: Nano (1C/2G) and Mini (2C/4G) fail both. Air (4C/8G) hits the CPU mark but provides only 8 GiB RAM — half the requirement — and must not be described as “already meeting spec”. Standard (8C/16G) exceeds CPU and meets RAM for the first time, making it the sole tier satisfying both metrics. On storage: all tiers have a fixed 20 GB system disk that cannot be expanded. Help center confirms resize operations only support CPU/RAM upgrades; disk expansion requires a data disk. Reinstall wipes system disk but preserves data disk. Therefore, all stateful directories and object storage must reside on the data disk, provisioned to the official 100 GiB baseline, not the 20 GB system disk.

Zone selection guidance: for mainland China console access, prefer hk_pro (CN2+BGP mainland-optimized). For lower traffic cost and predominantly overseas users, choose us_pro (¥0.025/GB, wider entry bandwidth). Strictly forbidden to place the sole copy of trace data or object storage in us_pro_special — its description explicitly states no data backup capability. If production has outgrown “single-node 7 containers”, follow the official scaling page to allocate dedicated resources per service; do not treat Standard as a production end-state.

Operational details: traffic billed on actual inbound/outbound GB; console daily traffic typically far below base fees. Large exports or using MinIO as object storage throughput require separate traffic and disk budgeting. Recommend setting a monthly bill cap under “Account Settings → Global Traffic Protection” and per-instance monthly traffic limits. Snapshots suit pre-upgrade/pre-resize short-term rollback; long-term retention demands cross-node backup. Unused test instances should be destroyed — shutdown stops CPU/RAM billing but disks (system + data) continue incurring retention charges. Pros: official specs consolidate CPU, RAM, disk, and seven services in one table, removing guesswork; per-second billing, Alipay/WeChat Pay, Chinese tickets. Cons: 20 GB system disk vs 100 GiB requirement almost guarantees extra data disk; Air meets CPU only, easy to undersize; single-node Compose table is not a production checklist; Singapore/Korea/Taiwan unavailable; us_pro_special unsuitable for sole data copies.

Scenario-Based Selection & Pitfall Checklist

  1. Quick functional validation of Langfuse single-node Compose on one box → Buy Standard (8C/16G), simultaneously attach ≥100 GiB data disk, pick hk_pro (mainland speed) or us_pro (cheap traffic). Ensure docker-compose.yml volumes point to data disk mount points.
  2. Tight budget, only core services (Web+Postgres+Redis) now; ClickHouse/MinIO external or later → Air (4C/8G) can barely start core trio, but 8 GiB RAM is far below 16 GiB baseline; co-locating ClickHouse and MinIO will almost certainly OOM — do not include in production plans.
  3. Team mostly overseas, mainland latency irrelevant, high traffic → Choose us_pro (¥0.025/GB, 100M peak), but never use us_pro_special for sole data copies; configure cross-node backup, not just same-node snapshots.
  4. Pitfall: ordering based on 20 GB system disk alone → Official requirement is 100 GiB; images, ClickHouse, Postgres, MinIO data will instantly fill 20 GB. Before ordering, add data disk via console or API, and map MINIO_DATA_DIR, CLICKHOUSE_DATA, POSTGRES_DATA entirely to that disk.
  5. Pitfall: treating shutdown as billing stop → Shutdown halts CPU/RAM charges, but disks (system + data) keep accruing retention fees. Fully unused instances must be destroyed; 3-day refund deducts only actual runtime, balance returned to source.

FAQ

Why doesn’t Air (4 vCPU / 8 GiB) count as “meeting official minimum”?

The official Sizes table lists both 4 vCPU and 16 GiB RAM as the single-node Compose threshold. Air meets CPU but provides only 8 GiB RAM — exactly half — and the source explicitly states it “cannot be written as ‘already meeting spec’”. Running all seven containers will almost certainly trigger the OOM killer.

Is the 20 GB system disk truly non-expandable? Any workaround?

Help center rules: resize supports only CPU/RAM upgrades; system disk cannot be expanded. The only workaround is attaching a data disk and directing all stateful service volumes in docker-compose.yml to the data disk path. Reinstall preserves the data disk, which is the recommended practice.

What is the difference between us_pro and us_pro_special? Can they be mixed?

us_pro offers mainland-optimized routing, ¥0.025/GB traffic, and standard backup capability. us_pro_special’s description explicitly states “no data backup capability”. The source stresses: do not place the sole copy of trace data or object storage in us_pro_special. The two zones cannot be mixed for core data storage scenarios.

Sources & References

Spotted outdated pricing, stock, or expired coupons?See methodology & report an update →

Related articles